lynxking Check Cord Dog Leash Long Lead Training Tracking Line Comfortable Handle Heavy Duty Puppy Rope 10ft 15ft 30ft 50ft for Small Medium Large Dog

SUITABLE THICKNESS CHECK CORD: To find a balance between weight and strength. 3/8” is a suitable thickness for long training dog leash, it has both strength and portability
NO TANGLE LONG ROPE LEASH: the round climbing rope and 360 degree rotating clasp design long training leash will not tangle whether it is in use or when you roll it up, great for hiking, camping, training, hunting, backyard, beach, recall training, outdoor play with tennis balls, and swimming
LIGHTWEIGHT AND NOT ABSORB WATER: soft and lightweight Non-absorbent material won’t get more and more heavy in the water and won’t sink, it will float when submerged and highly visible against any background.

Add to wishlistAdded to wishlistRemoved from wishlist 0
Add to compare

SUITABLE THICKNESS CHECK CORD: To find a balance between weight and strength. 3/8” is a suitable thickness for long training dog leash, it has both strength and portability
NO TANGLE LONG ROPE LEASH: the round climbing rope and 360 degree rotating clasp design long training leash will not tangle whether it is in use or when you roll it up, great for hiking, camping, training, hunting, backyard, beach, recall training, outdoor play with tennis balls, and swimming
LIGHTWEIGHT AND NOT ABSORB WATER: soft and lightweight Non-absorbent material won’t get more and more heavy in the water and won’t sink, it will float when submerged and highly visible against any background.
SOFT AND DURABLE DOUBLE LAYER WOVEN HANDLE: check cord has a comfortable woven double layer handle, the joint of the rope is sewn by the machine and is very strong.
SIZE: 3/8″ (9.5 mm) in diam ,by 15 foot, 30 foot and 50 foot three length for different training purpose

Specification: lynxking Check Cord Dog Leash Long Lead Training Tracking Line Comfortable Handle Heavy Duty Puppy Rope 10ft 15ft 30ft 50ft for Small Medium Large Dog

Brand

User Reviews

0.0 out of 5
0
0
0
0
0
Write a review

There are no reviews yet.

Be the first to review “lynxking Check Cord Dog Leash Long Lead Training Tracking Line Comfortable Handle Heavy Duty Puppy Rope 10ft 15ft 30ft 50ft for Small Medium Large Dog”

Your email address will not be published. Required fields are marked *

lynxking Check Cord Dog Leash Long Lead Training Tracking Line Comfortable Handle Heavy Duty Puppy Rope 10ft 15ft 30ft 50ft for Small Medium Large Dog
lynxking Check Cord Dog Leash Long Lead Training Tracking Line Comfortable Handle Heavy Duty Puppy Rope 10ft 15ft 30ft 50ft for Small Medium Large Dog
Allbreedsdogstore.com
Logo
Compare items
  • Total (0)
Compare
0
Shopping cart